Latest Projects

 

 

Yarra Valley Water – WPS078 Mt Dandenong Water Pump Station – 2011

As high level zones require full time pumping PROVE Infrastructure director, Frank Iapozzuto and Underground Pump Supplies were engaged to provide functional, preliminary and final design for WPS078.  The project involved delivering full mechanical and electrical designs which incorporated the innovative use of 5 x vertical multistage pumps.

The station successfully caters for the low flow, normal and for emergency […]

Yarra Valley Water – Design and installation of ‘Muncher’ within SPS639 -2011

PROVE Infrastructure director, Frank Iapozzuto provided Yarra Valley Water a cost effective alternative to manage the unique pump blockages that were occurring at SPS639.  Frank hand-picked a select task team which was formed to assist in providing a solution to this high lift pump station in order to reduce the huge ongoing monthly costs due to pump blockages.  The project included investigation, research, consultancy, design, […]

Central Highlands Water – Capital upgrade of RAS Pumps -2011

As a sub-contractor to Underground Pump Supplies, PROVE Infrastructure provided labour services in replacing  two new progressive cavity pumps at Ballarat Sewage Treatment Plant.  The team successfully installed the two new pumps, stainless pipework and valving within what was a very tight time frame.

The project was recognised and complemented by the Engineers and Plant […]

Yarra Valley Water – OH&S Electrical rectifications 2013

PROVE Infrastructure has recently completed rectification works for Yarra Valley Water on more than 150 assets. The project involved minor and major works including test and tagging, labelling, drawing mark-ups, switchboard partitioning, replacement of critical electrical equipment, design and installation of custom machine guarding, etc. The project was completed using qualified technicians, fitters and […]